Monday, August 4, 2008

Some results from the Cart-to-Solar project

With a deadline looming (and past) and no students around since the start of summer final exams, I spent part of last week and this weekend putting together a mid-point report to the Foundation on the Cart-to-Solar project. As you all recall, Aaron did a great job getting this funded and on its way to a successful conclusion this summer, organizing a team that carried on the work even when he was not here. However, I was not aware of just how well the project worked out until I processed the data into the form shown below.

The baseline data acquired during the spring are shown with diamonds on this graph. (The two green squares are results of an initial trial with the solar panels and should be ignored here.) I made the three points that were outliers red and excluded them when computing the mean and sample standard deviation shown with the blue band. The yellow band shows the average and standard deviation if all points are included.


You can see for yourself how consistent most of the data were. (The gap in March is Spring Break, and one of the anomalous points appeared when the cart sat idle while the campus was closed.) Aaron did some nice work to try to understand what might be going on with those red points, but I won't include the graph or try to explain it here.

FYI, getting about three miles per kWhr corresponds to an operating cost of about 5 cents per mile for "fuel". (This does not count the cost of amortizing the cost of replacement batteries every few years.) These carts are pretty efficient.

The data acquired after the solar panels installed are shown with squares. There are really three sets of data here: The green squares were some initial tests with three panels, the first set of maroon squares were tests with six panels used in one configuration, while the ones in the region following a break for spring finals, the area covered by the green band, used a different configuration.


You can see very clearly that almost all of the data in this last set show performance that is better than any of the baseline observations. I speculate that the three low points were overcast days but found no weather records to use to test this guess. The green band shows the mean and sample standard deviation for this set (including the three low points). The average value is about a 50% improvement on the efficiency of the cart, which is, I think, about what Aaron had predicted. The band is wider than for the baseline data because of the variability introduced by weather conditions.

FYI, adding the panels saved about $2 worth of electricity over those six weeks. An interesting question is whether they will improve battery life and reduce that cost as well.

In my opinion, the primary goals of the project have been completed but (as discussed at our meeting on July 11, there are still some great things to do this fall to wrap up work with one cart, improve how it works, do the final report, and possibly start a longer-term project monitoring battery life and/or convert other carts.

Good work, everyone!

ASME - TSS joint meeting on Biomass plant

Ben Cowart writes about Thursday's meeting:

Subject: ASME - TSS joint meeting Time changed to 7 - 9 PM, August 7th

All - please put on your calendar to attend the August 7th meeting of the joint meeting with the Tallahassee Scientific Society meeting from 7- 9 at the City Hall Commission Chambers. The topic will be the BG&E Biomass Plant. Several local activist have been calling the project "incineration in disguise" and this forum is to hear the evidence from the Pro and Con groups on the project. Should prove to be lively.

Please try to attend.

This will be our August Meeting.

Thanks,
Ben


I've looked at the BG&E proposal and they do take an interesting angle. My reading of it is that at one point they argue (correctly) that they are not burning the waste materials so they are not governed by waste-to-energy incinerator rules. (They are converting it to gas in a low temperature process quite unlike the plasma torch process we heard about a summer or two ago.) However, at another point they argue that the power plant that burns this gas is not subject to emission rules for power plants because it is a waste-to-energy facility, so they don't have to account for what is in the gas they produce.

Ben may be able to tell us what they would have to do at Hopkins if they bought this gas from BG&E and burned it. That will, indeed, make an interesting discussion.

Friday, July 11, 2008

Notes from the 11 July meeting

We had a very productive meeting this afternoon, even though part of the group thought it was at 2 and the rest showed up at the normal time of 3:30. Such is life.

Two things went on simultaneously. I spent much of the time winding a coil and making a small coil gun actually work (estimated muzzle velocity of 2 m/s). Now we actually know what we are doing, and Emma did a great job taking apart some more cameras and figuring out how the other type works.

The other half was devoted to design work on the Solar Cart charging control system, with the help if Ivan Baggett, a local EE who owns his own company, Bagotronix. From what I could see, that went really well and we owe him a lot of thanks.

Anyone interested in learning more about the controllers he designs and the tools he uses can find some links from his company web site. Thanks again to Ivan and whoever networked with him.

PS -
I rather stupidly managed to wait until I was writing this at 11pm to think what a good idea it might be to have him talk to us about the challenges of running a small company. I know some of my recent alumni are interested in being their own boss. Would the Business club be interested?

Wednesday, June 25, 2008

Innovative Architecture - Engineering

Check out this story from the BBC about a planned building in Dubai where each floor will rotate independently under the command of its owner.The building has 80 stories and is 420 m high, which is more than a quarter mile. The video showing a simulation of what it could look like is quite amazing.

In addition, there are wind turbines built into the building so it will generate its own power. There is a set of wind turbine blades between each floor of the building.

Wednesday, June 18, 2008

VIEW from the CHAIR // FRIDAY MEETING 6/20/08 @ 3:30PM

Hello,

We have another meeting coming up this Friday (6/20/08) at 3:30 in SM 260 ‘the usual.’ Unfortunately I will not be able to attend. However we have everything in place that it should be fine.


We will be continuing the electronics exploration from last week.


The committee for the dolly rack will be reporting on the progress with the computer generated plans for the golf cart rack.


We are still building the club directory. If you would like your contact information in this directory email your desired contact information to babic541@mymail.tcc.fl.edu.

We have also finished our signup sheets which will be placed in the SM office for ease of access.


Have a great meeting,
Vernon Babich
TCC Engineering Club Chair

(850) 510-2473

Thursday, June 12, 2008

MESSAGE FROM VERNON

Hey Everyone,

Our last meeting was a great success. Some new plans for the upcoming weeks have been established as well as for the future. We will be finishing up a few mechanical things on the cart such as the dolly rack and the fans. The panels will also be glued on with electrical safe silicon based glue. For the future we are planning on utilizing new batteries for an ongoing project.

Our future meetings will be based mostly on education and application of electronics. Since our goal in the solar project is to increase efficiency, it is essential that we all know how to use and improve the basics of the cart’s electrical set up. These classes are currently being headed up by Aaron Bauldree who we all appreciate very much for spending his time teaching us. They will be starting out basic and if anyone misses a meeting you should contact someone in the club or email me at babic541@mymail.tcc.fl.edu. By teaching each other, we all improve and of course get to know each other.

It also seems that a specialization approach to the projects in the future is an idea held by most of the club. It’s been really exciting to see everyone breaking up things by engineering discipline and forming committees. Currently we have one committee for the dolly rack but others seemed to be unofficially forming. The club also wants to be able to understand every part of the project.

So much more to come! I hope to see you all at the next meeting this Friday at 3:30 pm in SM 260 “the usual.”

Vernon Babich
Engineering Club Chair.


=================================

Notes: The "last meeting" referred to above was on Friday, June 6, 2008 @ 3:30 pm in room SM 260. The next meeting will be Friday, June 13, 2008 @ 3:30 pm in room SM 260.
~~ DJ

Wednesday, June 4, 2008

SUMMER 2008 MEETING SCHEDULE


Click on the FLYER to ENLARGE.